手机快三投注

  • <tr id='EvAFRi'><strong id='EvAFRi'></strong><small id='EvAFRi'></small><button id='EvAFRi'></button><li id='EvAFRi'><noscript id='EvAFRi'><big id='EvAFRi'></big><dt id='EvAFRi'></dt></noscript></li></tr><ol id='EvAFRi'><option id='EvAFRi'><table id='EvAFRi'><blockquote id='EvAFRi'><tbody id='EvAFRi'></tbody></blockquote></table></option></ol><u id='EvAFRi'></u><kbd id='EvAFRi'><kbd id='EvAFRi'></kbd></kbd>

    <code id='EvAFRi'><strong id='EvAFRi'></strong></code>

    <fieldset id='EvAFRi'></fieldset>
          <span id='EvAFRi'></span>

              <ins id='EvAFRi'></ins>
              <acronym id='EvAFRi'><em id='EvAFRi'></em><td id='EvAFRi'><div id='EvAFRi'></div></td></acronym><address id='EvAFRi'><big id='EvAFRi'><big id='EvAFRi'></big><legend id='EvAFRi'></legend></big></address>

              <i id='EvAFRi'><div id='EvAFRi'><ins id='EvAFRi'></ins></div></i>
              <i id='EvAFRi'></i>
            1. <dl id='EvAFRi'></dl>
              1. <blockquote id='EvAFRi'><q id='EvAFRi'><noscript id='EvAFRi'></noscript><dt id='EvAFRi'></dt></q></blockquote><noframes id='EvAFRi'><i id='EvAFRi'></i>

                南中高速项目完成南沙区︻区级用地报批组卷上报工作

                时间:2020.09.10 发布者:市高公司阅读量:64
                分享:

                9月9日,南中高速项目南沙区整体用地报批组卷ξ材料正式上报市规划和自然资源局,是南中高速项目坚决贯彻落实省自然资源厅发布的《百个重大建设项目“百日攻坚”专项行动工作方案》的重↘要举措。

                自确定广州段南沙区用地红线范围以来,南中高速项目便争分夺秒开展用㊣地报批工作。在项》目领导、同事共同努力下,项目高效完成了国有和集体土←地、村与村的指界确认、测量等工作╲,快速编制勘测⊙定界报告,解决了10多块历史♂遗留的“飞地”问题,完成了南沙段5个行政』村签字盖章工作,为实现市规划和自然资源局南沙区分局的〓各类征地补偿方案、耕地(水田)指标确认、南沙区政府结论意见等审批程序的快速审核打下坚实↘基础。经过不懈努∏力,项目历时3个月完成南沙区区级用地报㊣ 批组卷上报工作。

                下一步,南中高速项目将全力跟进南沙段用地报批材料●上报审查工作,同步开展中山△段的用地报批、征地拆迁、管线迁改等工作,力争早〓日实现项目全面开工建设。(市高公司 陈坚、何奇、张思婕)


                网站地图

                SITE MAP